{"id":2465,"date":"2014-06-20T11:07:52","date_gmt":"2014-06-20T09:07:52","guid":{"rendered":"https:\/\/www.atalaya-golf.com\/index.php\/2014\/06\/20\/atalaya-golf-improve-its-facilities\/"},"modified":"2014-06-20T11:07:52","modified_gmt":"2014-06-20T09:07:52","slug":"atalaya-golf-improve-its-facilities","status":"publish","type":"post","link":"https:\/\/www.atalaya-golf.com\/atalaya-golf-improve-its-facilities\/","title":{"rendered":"Atalaya Golf improves its facilities"},"content":{"rendered":"\n
\u00a0This year an amount close to \u20ac 600,000 will be invested divided into:<\/p>\n
– Underground cables and medium voltage towers No. 16 and 15 of the New Course.<\/p>\n
– New ladies locker in the clubhouse.<\/p>\n
– Several outlets tees totally renovated: wider to withstand conditions in buenisimas occupancy peak seasons.<\/p>\n
– Increase the distance from the Old Course tees of professionals with over 165 meters.<\/p>\n
– 3,000 tons of sand on the Old Course to improve surface drainage.<\/p>\n
– Electrical installation, public address, painting walls in the restaurant.<\/p>\n
– Wall covering the area of \u200b\u200bkiosk and caddy-master with natural stone.<\/p>\n
– Improved caminitos golf on the Old Course and New Course.<\/p>\n
– Reconstruction of way down the caddy-master to the kiosk (widening and installation of non-slip floor).<\/p>\n
– Concrete stairway in various tees.<\/p>\n
– Program for removal and disposal of weeds in both golf courses.<\/p>\n
– Improvement of the irrigation system and installation of instruments for energy savings.<\/p>\n
<\/p>\n
The course shows very good condition, which will improve during the coming weeks.<\/p>\n
<\/p>\n
<\/p>\n
<\/p>\n
<\/p>\n
<\/p>\n
<\/p>\n
<\/p>\n
<\/p>\n
\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"
\u00a0This year an amount close to \u20ac 600,000 will be invested divided into: – Underground cables and medium voltage towers No. 16 and 15 of the New Course. – New ladies locker in the clubhouse. – Several outlets tees totally renovated: wider to withstand conditions in buenisimas occupancy peak seasons. – Increase the distance from the Old Course tees of professionals with over 165 meters. – 3,000 tons of sand on the Old Course to improve surface drainage. – Electrical installation, public address, painting walls in the restaurant.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[61],"tags":[154,78,70],"yoast_head":"\n