1.0Atalaya Golf & Country Clubhttps://www.atalaya-golf.comadminhttps://www.atalaya-golf.com/author/admin/The construction of hole one is moving swiftly at Atalaya Golf Course - Atalaya Golf & Country Clubrich600338<blockquote class="wp-embedded-content" data-secret="ARYx36dlEg"><a href="https://www.atalaya-golf.com/the-construction-of-hole-one-is-moving-swiftly-at-atalaya-golf-course/">The construction of hole one is moving swiftly at Atalaya Golf Course</a></blockquote><iframe sandbox="allow-scripts" security="restricted" src="https://www.atalaya-golf.com/the-construction-of-hole-one-is-moving-swiftly-at-atalaya-golf-course/embed/#?secret=ARYx36dlEg" width="600" height="338" title="“The construction of hole one is moving swiftly at Atalaya Golf Course” — Atalaya Golf & Country Club" data-secret="ARYx36dlEg" frameborder="0" marginwidth="0" marginheight="0" scrolling="no" class="wp-embedded-content"></iframe><script> /* <![CDATA[ */ /*! This file is auto-generated */ !function(d,l){"use strict";l.querySelector&&d.addEventListener&&"undefined"!=typeof URL&&(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&&!/[^a-zA-Z0-9]/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret="'+t.secret+'"]'),o=l.querySelectorAll('blockquote[data-secret="'+t.secret+'"]'),c=new RegExp("^https?:$","i"),i=0;i<o.length;i++)o[i].style.display="none";for(i=0;i<a.length;i++)s=a[i],e.source===s.contentWindow&&(s.removeAttribute("style"),"height"===t.message?(1e3<(r=parseInt(t.value,10))?r=1e3:~~r<200&&(r=200),s.height=r):"link"===t.message&&(r=new URL(s.getAttribute("src")),n=new URL(t.value),c.test(n.protocol))&&n.host===r.host&&l.activeElement===s&&(d.top.location.href=t.value))}},d.addEventListener("message",d.wp.receiveEmbedMessage,!1),l.addEventListener("DOMContentLoaded",function(){for(var e,t,s=l.querySelectorAll("iframe.wp-embedded-content"),r=0;r<s.length;r++)(t=(e=s[r]).getAttribute("data-secret"))||(t=Math.random().toString(36).substring(2,12),e.src+="#?secret="+t,e.setAttribute("data-secret",t)),e.contentWindow.postMessage({message:"ready",secret:t},"*")},!1)))}(window,document); /* ]]> */ </script> https://www.atalaya-golf.com/wp-content/uploads/2016/01/160114.AT_.BuenRitmoEnLosTrabajosDelHoyo1.jpg800600The irrigation system has been tested and cycled to ensure smooth operation on the green, fairway and roughs. The green is ready to be seeded in a few days, first finishing of the bunker and sodding the green surroundings in order to start with the seeding. The course sand plus the “silice” sand layer and plastic liner are in place ready to receive the seed in accordance with the USGA recommendations Atalaya Golf has followed the USGA recommended method of green construction as also the fairways and drainage construction methods for this new hole.